NR 632 Week 6 Assignment; Sustainability of the Planned Change Project Worksheet
-
$20.00
Institution | Chamberlain |
Contributor | Adrian Smith |
Instructions: Consider the resources and support that will be necessary to sustain the planned change project. Complete the column on the right as you consider sustainability:
Instituition / Term | |
Term | Summer |
Institution | Chamberlain |
Contributor | Adrian Smith |